
Form 1024 (08.13) ©SOR Inc.
9/12
100
0
Trip
Adjust
Span
Zero
Fuse
F1
J2
PC Board
Retention
Screw (2)
J1
High Flow/Level
Low Flow
J1
NOTE: For use as Flow Switch
1. Insertion Length should be
approximately 1/4 Pipe I.D.
2. The unit should be installed on a
straight pipe run with at least 10
pipe diameters upstream and 5
pipe diameters downstream.
J2
Position
B
Postion
A
L1 Red “ON” for Dry/No Flow L2 Green “ON” for Wet/
Full Flow
Commentaires sur ces manuels